Zoom link:
https://zoom.us/j/997256543?pwd=MWptM0F0Y1NpckhFVUgrZnM2TkJ0Zz09
Attendees:
Please add your name in here:
- Walter Kozlowski (Telstra)
- Suresh Krishnan (Kaloom)
- Tomas Fredberg (Ericsson)
- Beth Cohen (Verizon)
- Tom Van Pelt (GSMA)
- Pankaj Goyal(AT&T)
- Petar Torre (Intel)
- Sukhdev Kapur (Juniper Networks)
- Karine Sevilla (Orange)
Agenda:
- Agenda
- Updates on current activities
- Next vF2F conference in February 2021: topics are required: Feb vF2F Feb 1-4: 2021 February LFN Developer & Testing Forum. Proposals due 15 January 2021. Put in the topic proposals here: 2021 February Developer Topic Proposals. Topics already done (as placeholders), need descriptions:
- Hybrid, multi-cloud model: DC to Edge (Pankaj, Walter)→ Pankaj to add add description
- Acceleration Abstraction (Petar, Tomas, Per) → Petar add description
- Beyond IaaS/CaaS for Cloud Infrastructure in RM (Petar, Pankaj, Walter) → Pankaj to add description
- Telemetry, monitoring, observability (Sukhdev, Petar, Zlatko) → Sukhdev to add description
- Edge (Beth, Ahmed) → Beth to add description
- Proposal: Introduction to Anuket → Beth to add
- All→ please add other topics if you want to present: F2F Org Committee already working - Beth, Scot Steele, Emma Foley, meeting tomorrow. Beth to coordinate for RM group
Next release (Elbrus)
- CNTT Elbrus Release Cycle
- M3 Contents Freeze: 15 January 2021,
- M4 Proofreading Freeze: 22 January 2021
- M5 Release Candidate : 26/01
- M6 Release Signoff: 29/01
Network/Hardware Management Hardware Infrastructure Management: function and APIs Tomas, Walter HighElbrus MVP PR#2144 under review, need to close out Primary & secondary networking Tomas, Suresh, Gergely MediumElbrus MVP PR#2155 approved, merged Operations Security (workloads and infrastructure) - alignment with ONAP Karine, Amy, Pankaj Closed for Elbrus Done from Elbrus MVP perspectiveKarine reviewing FS.31 and FS.40 from GSMA FASG from the possible alignment perspective for post Elbrus Operations and Life-cycle Management HighElbrus MVP PR#2129 approved, merged
Activities/actions:
9.3.2 Observability Sukhdev to raise relevant PRs with the contents based on reviewed google docs 9.3.3 Telemetry Sukhdev to raise relevant PRs with the contents based on reviewed google docs9.5 Automation
9.5.1 Infrastructure LCM Automation 9.5.1.1 Hardware Configuration CI/CD Tomas to raise PR for others' input 9.5.1.2 Networking Automation Tomas to raise PR for others' input
9.5.1.3 Software Development CI/CD Saad to raise PR for others' input
9.5.2 Software Onboarding Automation and CI/CD Requirements 9.5.2.1 Software Onboarding Automation (done and merged into master) 9.5.2.2 Software CI/CD Requirements (done and merged into master)
9.5.3 Tenant Creation Automation 9.5.3.1 Pre-tenant Creation Requirements Beth, Pankaj, Walter to work on contents for PR#2129
9.5.3.2 Tenant Networking Automation Beth, Pankaj, Walter to work on contentsAutomation (closed loop automation) MediumClosed for Elbrus Should be in part in LCM (Chapter 9) - Issue 2087
Proposed to include into Chapter 9 (see above)Gap 10.3.6 raised in Chapter 10Observability/telemetry Sukhdev, Zlatko, Petar MediumMVP Issue 2052 contains a link to a google document: https://docs.google.com/document/d/1BjRTIPVOs7vqZvvmd65CWX0vJU3YCGcq5McVyyxdXoY/edit?usp=sharingSee action om Sukhdev for 93.2 and 9.3.3 Acceleration Hardware acceleration abstraction Petar, Tomas, Per, Walter HighMVP Issue 2051; All → PRs for review now: Go to Issue 2051 https://github.com/cntt-n/CNTT/issues/2051 for the list of all PRs in the right order Storage Karine, Petar MediumClosed for Elbrus Needed a structureFurther details needed (all classes of storage)Issue 2056: Need contributors and expertise https://etherpad.opendev.org/p/ecg-vptg-october-2020 it has a link to the June PTG notes
Action: Beth → provide a structure (PTG etherpad can be used); work in progressSpecial use cases Load balancing Per, Sukhdev Medium Issue 2095: Per creating PR for Sec 3.5.1Per to run a vF2F session on load balancing Mutual discovery (workloads/infrastructure) Sukhdev, Tomas Medium Issue 2088; Sukhdev to add the concept description for commentsLeave for after Elbrus Service function chaining Suresh, Sukhdev MediumMVP Issue 2089; text in Issue for All to commentAll review → PR#2174 Model for Enterprise Cloudand Edge Walter, Pankaj, Ahmed MediumMVP Issue 2049: Multi/hybrid cloud from Data Centre to Edge;
PR#2118 approved and mergedAlignment with ONAP Investigate topics other than security Petar LowOngoing Petar to present to RM meeting Alignment with GSMA OPG Investigate alignment points Walter LowOngoing Depends on outcomes of joint OITF and OPG meetings Alignment with ORAN? Influence ORAN regarding telco cloud Ongoing Tomas raised this question as he participates in WG 6. Karine to find out how we could discuss possible dependencies, alignments, cloud principles.... Alignment with ODIM Martin Ongoing Bring to this meeting the actions, comments from previous sessions and vF2F Granularity of RM profiles Issue 2068Ricardo as the new RA-2 leader has joined RM meetings REview of RM Chapter 2 use cases All Issues 2067 Actions:
- All → Review PR#2164 (Security minor updates)
- Karine → inform the RM Team about O-RAN (WG 6) collaboration ver 2 of the design document (Cloud Platform) will be finalised by the end of November (reference conformance for K8s). The document will be available for CNTT by the end of January 2021.
- All→ please add vF2F topics if you want to present other topics
- Beth → provide a structure for Storage (PTG etherpad can be used) - leave it for after Elbrus, wlll be a vF2F session
- All → review Issue 2089 'Service Function Chaining', text in Issue
Minutes:
- GSMA non-members who want to participate in OITF please contact Tom Van Pelt , tpelt@gsma.com. Those who are interested in GSMA PRD FS.31 - it is available at https://www.gsma.com/security/resources/fs-31-gsma-baseline-security-controls/
- Cloud Native Network Functions (CNF) Working Group: https://github.com/cncf/cnf-conformance/pull/450