You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Zoom link:

https://zoom.us/j/997256543?pwd=MWptM0F0Y1NpckhFVUgrZnM2TkJ0Zz09

Attendees:


Please add your name in here:

Agenda:

    • Agenda 
      • Updates on current activities
      • Next vF2F conference in February 2021: topics are required: Feb vF2F Feb 1-4: 2021 February LFN Developer & Testing Forum. Proposals due 15 January 2021. Put in the topic proposals here: 2021 February Developer Topic Proposals. Topics already done (as placeholders), need descriptions:
        • Hybrid, multi-cloud model: DC to Edge (Pankaj, Walter)→ Pankaj to add add description
        • Acceleration Abstraction (Petar, Tomas, Per) → Petar add description
        • Beyond IaaS/CaaS for Cloud Infrastructure in RM (Petar, Pankaj, Walter) → Pankaj to add description
        • Telemetry, monitoring, observability (Sukhdev, Petar, Zlatko) → Sukhdev to add description
        • Edge (Beth, Ahmed) → Beth to add description
        • Proposal: Introduction to Anuket → Beth to add
      • All→ please add other topics if you want to present: F2F Org Committee already working - Beth, Scot Steele, Emma Foley, meeting tomorrow. Beth to coordinate for RM group

Next release (Elbrus)

  • CNTT Elbrus Release Cycle
    • M3 Contents Freeze:    15 January 2021, 
    • M4 Proofreading Freeze:       22 January 2021
    • M5 Release Candidate :   26/01
    • M6 Release Signoff:   29/01
      • Network/Hardware ManagementHardware Infrastructure Management: function and APIsTomas, WalterHighElbrus MVPPR#2144 under review, need to close out

        Primary & secondary networkingTomas, Suresh, GergelyMediumElbrus MVPPR#2155 approved, merged
        OperationsSecurity (workloads and infrastructure) - alignment with ONAPKarine, Amy, PankajClosed for ElbrusDone from Elbrus MVP perspectiveKarine reviewing FS.31 and FS.40 from GSMA FASG from the possible alignment perspective for post Elbrus

        Operations and Life-cycle Management 
        HighElbrus MVP
        PR#2129 approved, merged
        Activities/actions:
           9.3.2 Observability Sukhdev to raise relevant PRs with the contents based on reviewed google docs   9.3.3 Telemetry Sukhdev to raise relevant PRs with the contents based on reviewed google docs9.5 Automation
           9.5.1 Infrastructure LCM Automation           9.5.1.1 Hardware Configuration CI/CD Tomas to raise PR for others' input          9.5.1.2 Networking Automation Tomas to raise PR for others' input
                  9.5.1.3 Software Development CI/CD Saad to raise PR for others' input
        9.5.2 Software Onboarding Automation and CI/CD Requirements          9.5.2.1 Software Onboarding Automation (done and  merged into master)          9.5.2.2 Software CI/CD Requirements (done and  merged into master)
        9.5.3 Tenant Creation Automation          9.5.3.1 Pre-tenant Creation Requirements Beth, Pankaj, Walter to work on contents for PR#2129
                  9.5.3.2 Tenant Networking Automation  Beth, Pankaj, Walter to work on contents 

        Automation (closed loop automation)
        MediumClosed for ElbrusShould be in part in LCM (Chapter 9) - Issue  2087
        Proposed to include into Chapter 9 (see above)Gap 10.3.6 raised in Chapter 10



        Observability/telemetrySukhdev, Zlatko, PetarMediumMVPIssue 2052 contains a link to a google document: https://docs.google.com/document/d/1BjRTIPVOs7vqZvvmd65CWX0vJU3YCGcq5McVyyxdXoY/edit?usp=sharingSee action om Sukhdev for 93.2 and 9.3.3
        AccelerationHardware acceleration abstractionPetar, Tomas, Per, WalterHighMVPIssue 2051; All → PRs for review now: Go to Issue 2051 https://github.com/cntt-n/CNTT/issues/2051 for the list of all PRs in the right order
        Storage
        Karine, PetarMediumClosed for ElbrusNeeded a structureFurther details needed (all classes of storage)Issue 2056: Need contributors and expertise https://etherpad.opendev.org/p/ecg-vptg-october-2020 it has a link to the June PTG notes
        Action: Beth → provide a structure (PTG etherpad can be used); work in progress
        Special use casesLoad balancingPer, SukhdevMediumIssue 2095: Per creating PR for Sec 3.5.1Per to run a vF2F session on load balancing

        Mutual discovery (workloads/infrastructure)Sukhdev, Tomas
        MediumIssue 2088; Sukhdev to add the concept description for commentsLeave for after Elbrus

        Service function chainingSuresh, SukhdevMediumMVPIssue 2089; text in Issue for All to commentAll review → PR#2174
        Model for Enterprise Cloudand Edge
        Walter, Pankaj, AhmedMediumMVPIssue 2049: Multi/hybrid cloud  from Data Centre to Edge;
        PR#2118 approved and merged
        Alignment with ONAPInvestigate topics other than securityPetarLowOngoingPetar to present to RM meeting
        Alignment with GSMA OPGInvestigate alignment pointsWalterLowOngoingDepends on outcomes of joint OITF and OPG meetings
        Alignment with ORAN?Influence ORAN regarding telco cloud
        OngoingTomas raised this question as he participates in WG 6. Karine to find out how we could discuss possible  dependencies, alignments, cloud principles....
        Alignment  with ODIM
        MartinOngoingBring to this meeting the actions, comments from previous sessions and vF2F 
        Granularity of RM profiles


        Issue 2068Ricardo as the new RA-2 leader has joined RM meetings
        REview of RM Chapter 2 use cases
        All
        Issues 2067

        Actions:

        • All → Review PR#2164 (Security minor updates)
        • Karine → inform the RM Team about O-RAN (WG 6) collaboration ver 2 of  the design document (Cloud Platform) will be finalised by the end of November (reference conformance for K8s). The document will be available for CNTT by the end of January 2021.
        • All→ please add vF2F topics if you want to present other topics
        •  Beth → provide a structure for Storage (PTG etherpad can be used) - leave it for after Elbrus, wlll be a vF2F session
        • All → review Issue 2089 'Service Function Chaining', text in Issue

        Minutes:

        1.  GSMA non-members who want to participate in OITF please contact Tom Van Pelt , tpelt@gsma.com.  Those who are interested in GSMA PRD FS.31 - it is available at  https://www.gsma.com/security/resources/fs-31-gsma-baseline-security-controls/
        2. Cloud Native Network Functions (CNF) Working Group: https://github.com/cncf/cnf-conformance/pull/450
  • No labels