- Walter Kozlowski (Telstra)
- Suresh Krishnan (Kaloom)
- Tomas Fredberg (Ericsson)
- Beth Cohen (Verizon)
- Tom Van Pelt (GSMA)
- Pankaj Goyal(AT&T)
- Petar Torre (Intel)
- Sukhdev Kapur (Juniper Networks)
- Karine Sevilla (Orange)
- Per Andersson (Kaloom)
- Toshiyasu Wakayama (KDDI)
- Ahmed El Sawaf
Agenda:
- Agenda
- Updates on current activities
- Next vF2F conference in February 2021: topics are required: Feb vF2F Feb 1-4: 2021 February LFN Developer & Testing Forum. Proposals due 15 January 2021. Put in the topic proposals here: 2021 February Developer Topic Proposals. Topics already done (as placeholders), need descriptions:
- Hybrid, multi-cloud model: DC to Edge (Pankaj, Walter)→ Pankaj to add add description
- Acceleration Abstraction (Petar, Tomas, Per) → Petar add description
- Beyond IaaS/CaaS for Cloud Infrastructure in RM (Petar, Pankaj, Walter) → Pankaj to add description
- Telemetry, monitoring, observability (Sukhdev, Petar, Zlatko) → Sukhdev to add description
- Edge (Beth, Ahmed) → Beth to add description
- Proposal: Introduction to Anuket → Beth to add
- All→ please add other topics if you want to present: F2F Org Committee already working - Beth, Scot Steele, Emma Foley, meeting tomorrow. Beth to coordinate for RM group
Next release (Elbrus)
- CNTT Elbrus Release Cycle
- M3 Contents Freeze: 15 January 2021,
- M4 Proofreading Freeze: 22 January 2021
- M5 Release Candidate : 26/01 M3 - 15 January 2021: Update on Elbrus Issues and PRs progress/actions and PRIORITIZATIONReview of the Elbrus MVP contents (needed by 20 December 2020):
- M6 Release Signoff: 29/01
Network/Hardware Management Hardware Infrastructure Management: function and APIs Tomas, Walter High
Contents will be available during the week of 14th December; Tomas to raise relevant PRsElbrus MVP
PR#2144 approved, merged Primary & secondary networking Tomas, Suresh, Gergely Medium
Elbrus MVP
PR#2155 approved, merged Operations Security (workloads and infrastructure) - alignment with ONAP Karine, Amy, Pankaj Closed for Elbrus Done from Elbrus MVP perspective
Karine reviewing FS.31 and FS.40 from GSMA FASG from the possible alignment perspective for post Elbrus
Operations and Life-cycle Management
Closed for Elbrus
MVP- PR#2129 approved, mergedContents in Sec 9.5Missing contents for 9.5.1 Infrastructure LCM Automation - post_Elbrus
Automation
Automation (closed loop automation)
Closed for Elbrus
Should be in part in LCM (Chapter 9) - Issue 2087Gap 10.3.6 raised in Chapter 10
Observability/telemetry Sukhdev, Zlatko, Petar
Closed for Elbrus Sec 9.6
Acceleration Hardware acceleration abstraction Petar, Tomas, Per, Walter
Closed for Elbrus Sec 3.8
Storage Karine, Petar
Closed for Elbrus
Work in progress on structure Special use cases Load balancing Per, Sukhdev
Closed for Elbrus Sec 10.3.2 (gap defined) Mutual discovery (workloads/infrastructure) Sukhdev, Tomas
Closed for Elbrus Sec 10.3.1 (gap defined)
Service function chaining Suresh, Sukhdev
Closed for Elbrus Sec 3.5.1
Model for Enterprise Cloud
and Edge Walter, Pankaj, Ahmed
Closed for Elbrus Chapter 8 Alignment with ONAP Investigate topics other than security Petar
LowOngoing Petar to present to RM meeting Alignment with GSMA OPG Investigate alignment points Walter
Ongoing Depends on outcomes of joint OITF and OPG meetings Alignment with ORAN? Influence ORAN regarding telco cloud Ongoing Tomas raised this question as he participates in WG 6. Karine to find out how we could discuss possible dependencies, alignments, cloud principles.... Alignment with ODIM Martin Ongoing Bring to this meeting the actions, comments from previous sessions and vF2F Granularity of RM profiles Ongoing Issue 2068
Ricardo as the new RA-2 leader has joined RM meetings
REview R2view of RM Chapter 2 use cases All Ongoing Issues 2067 Actions:
- All → Review PR#2164 (Security minor updates)
- Karine → inform the RM Team about O-RAN (WG 6) collaboration ver 2 of the design document (Cloud Platform) will be finalised by the end of November (reference conformance for K8s). The document will be available for CNTT by the end of January 2021.
- All→ please add vF2F topics if you want to present other topics
- Beth → provide a structure for Storage (PTG etherpad can be used) - leave it for after Elbrus, wlll be a vF2F session All → review Issue 2089 'Service Function Chaining', text in Issue
Minutes:
- GSMA non-members who want to participate in OITF please contact Tom Van Pelt , tpelt@gsma.com. Those who are interested in GSMA PRD FS.31 - it is available at https://www.gsma.com/security/resources/fs-31-gsma-baseline-security-controls/
- Cloud Native Network Functions (CNF) Working Group: https://github.com/cncf/cnf-conformance/pull/450
Agreed
Issue 2050
Requirements for NBI from HIM: work in progress
Probably RA-2 topic, discuss with Tom K. Gergely, Georg Kunz, whether RM can help (prob general guidance and requirements)
Issue 2085: work in progress
Contents will be available during the week of 14th December; Tomas to raise relevant PRs
High
All → PR#2129 for review
Action: Issue 2086; identify gaps in Chapter 9 - open fort comments and reviews
9.3.2 Observability Sukhdev to raise relevant PRs with the contents based on reviewed google docs
9.3.3 Telemetry Sukhdev to raise relevant PRs with the contents based on reviewed google docs
9.5 Automation
9.5.1 Infrastructure LCM Automation
9.5.1.1 Hardware Configuration CI/CD Tomas to raise PR for others' input
9.5.1.2 Networking Automation Tomas to raise PR for others' input
9.5.1.3 Software Development CI/CD Saad to raise PR for others' input
9.5.2 Software Onboarding Automation and CI/CD Requirements
9.5.2.1 Software Onboarding Automation (done and merged into master)
9.5.2.2 Software CI/CD Requirements (done and merged into master)
9.5.3 Tenant Creation Automation
9.5.3.1 Pre-tenant Creation Requirements Beth, Pankaj, Walter to work on contents for PR#2129
9.5.3.2 Tenant Networking Automation Beth, Pankaj, Walter to work on contents
Medium
Proposed to include into Chapter 9 (see above)
Issue 2052 contains a link to a google document: https://docs.google.com/document/d/1BjRTIPVOs7vqZvvmd65CWX0vJU3YCGcq5McVyyxdXoY/edit?usp=sharing
See action om Sukhdev for 93.2 and 9.3.3Medium
MVP
High
MVP
Issue 2051;
All → PRs for review now: Go to Issue 2051 https://github.com/cntt-n/CNTT/issues/2051 for the list of all PRs in the right orderMedium
Action: Beth → provide a structure (PTG etherpad can be used); work in progressNeeded a structure
Further details needed (all classes of storage)
Issue 2056: Need contributors and expertise https://etherpad.opendev.org/p/ecg-vptg-october-2020 it has a link to the June PTG notes
Issue 2095: Per creating PR for Sec 3.5.1
Per to run a vF2F session on load balancing
Issue 2088; Sukhdev to add the concept description for comments
Leave for after ElbrusMedium
MVP
Issue 2089; text in Issue for All to comment
All review → PR#2174Medium
MVP
Issue 2049: Multi/hybrid cloud from Data Centre to Edge;
PR#2118 approved and merged
Low