Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Next Steps-
    • Building Blocks/Proof Points:
      • Deployment through Anuket and Kubernetes to instantiate CU/DU functions (Muddasar)
      • Day 1 configuration/alignment of CU/DU
        • What configuration interface does GXC support?
      • Proof Point 1- Deployment of K8 workloads without any function (Muddasar)
      • Proof Point 2 -Deployment of workload specific to the core and specific to RAN (Muddasar)
      • Proof Point 3 -Can workloads be configured? (Muddasar)
      • Proof Point desired outcomes: (Muddasar)
        • 5G Core is deployed and configured
        • RAN is deployed and configured
        • UE simulator can joint the network and access the services (SMS, voice, data)
  • Labs:
  1. Kaloom (Montreal) - CU/DU being setup in Kaloom (Ganesh). workplan? Goal- end to end slicing core to RAN. Architecture diagram?
  2. UNH
  3. Wavelabs (India)
  4. Equinix (Dallas)
  5. Aarna

...