...
- ONE Summit Demo Planning Underway
- SG SBP Feature as part of opening keynote on Oct 11 (7 minutes, set up + video snapshot of slicing + dashboards, closing)
- LFN Kiosk in LF Both Pavilion (5 minutes, same slicing snapshot), different slides, different talking points)
- Behind the Scenes Lab Video (how the network is set up in Montreal, fun, personable)
- LFN Demo Webinar (November TBD).
- LFN Website
- Updating the 5G SBP page + Adding a new Collaboration space
- Goal: Make more of a destination/portal/collaboration space (in stages)
- Launch Assets:
- Press Release Mention
- Videos
- Website Updates
- How To Guide (under development)
Slides- DPDK added to Phase 1
Videos Required (Initial)
1 clip of degraded video on Slice A (30 seconds)
1 clip of clear video on Slice B (30 seconds)
1 clip of Rebaca dashboard showing telemetry data for Slice A (30 seconds)
1 clip of Rebaca dashboard showing telemetry data for Slice B (30 seconds)
Notes:
- LFN will provide the video clip to run through each slice.
- The slicing clips needs to be the same video.
- Demo team will be responsible for screen capture.
- We will match up the timing and split screen display with editing
- We need the 4 screen capture demo videos by 9/27.
Note: We've added the DPDK logo to the slide phase diagrams (linkedin in the left hand column)
Workplan - Louis/Amar lead
Magma Integration Update: This has not happened yet. The point person on this, Seshu has been sick. Sriram to synch with Lucasz to see about coverage.
Anuket Instal?
OANP Instal?
Sriram: Needs 3-4 Days to get this into a presentable format.
GennXcom: Documentation needed. Louis to follow up with Hardik.
Rebaca: Documentation needed. Louis to follow up with Samir.
Kader Khan: Wavelabs working with Rebaca to to get this going (testing Magma with Abot).
Reminder on Documentation- send config steps, log info, links, screen shots, etc to lilluzzi@linuxfoundation.org. No need to format. It will be sorted, formatted, and placed on the wiki.
...