You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Overview

This is an area to share information on the LFN Landscape:

LFN Landscape (In Beta): https://landscape.lfnetworking.org/

LFN Landscape GitHub: https://github.com/lfnetworking

Phase 1 (May - August): Set up landscape view that shows the LF Networking member levels.

Phase 2 (September): Build Verification Tab based on the Anuket Assured Program

Phase 3: (October - November): Build out macro landscape view with LFN Projects/Members mapped against the Open Source Networking Stack

Priority Tasks

Current Landscape:

—Hide Landscape Pane (replace Landscape View with Member View, Keep Landscape name, remove Member pane) (Harish)

—Fix Commscope + MEF Forum Logos (Need color logos) (Brandon to check)

—Arris/Commscope Mix Up (Brandon to check)

—Card Mode: Add member levels to Card Mode: Platinum, Gold, Silver, Associate (Harish)

—Initiate LFN Landscape Build to see if MSFT appears, troubleshoot with John (Trevor)

New Landscape Tab/Pane:

—Generate New Tab/Pane. Name: "Verification" (Harish)

—Format:

  1. Please see this example from Open Mainframe Alliance: https://landscape.openmainframeproject.org (Scroll down to "Zowe Conformant" Row)
  2. Recreate this row on the Verification Tab
  3. Replace "Zowe Conformant" with "Anuket Assured". Replace "API Mediation Layer ZOWE V1" with "Infrastructure". Replace "App Framework ZOWE V1" with "Workload". Remove other columns.

—Develop Product Card (Harish)

Format:

  1. As badges are approved in these categories, the company logos earning these badges will appear here. Upon click, a custom card will appear. The card needs to be built and will look like this:

Once this custom card has been built, we'll start mapping the card fields to actual data sources (sample data at first): Company logo, LFN member level, AA Logo (workload or infra), product name, product description, Anuket Assured release (date). Note: These fields and names are subject to change. Harish, please go ahead and get started building these. Sandra, let's start mapping to where these cards will pull data from (LFN Repo, GitLab, etc.) and start adding some sample entries so that the card will begin to populate. 

—Confirm badges when ready (Brandon)

Hours Tracking

Week of Sept 6: 16 Hours 10 Minutes (billable hours)

Week of Sept 13: TBD



  • No labels