You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Table of Contents

Overview

The intention of this page is to outline what CNTT "success" looks like by June @ LFN DDF 2020, along with high level tracking items that need to be completed.

Success is defined as:

  1. TBD - documentation created ? test suites defined ? test suites executed ?
  2. TBD
  3. TBD

To-Do (In General)

This is a comprehensive list of work that can be done. A subset of the list below will go into  Hallasan (and will be saved in the release notes for Hallasan).

A: To be included in Hallasan Release.

B: Nice to include in Hallasan Release.

C: Low Priority for Hallasan Release.

Reference Model


#Deliverable

Target Date

( // )

Comments
0


1




2




3






Reference Architecture 1


#Deliverable

Target Date

( // )

Comments
1




2




3


4






Reference Implementation 1


#Deliverable

Target Date

( // )

Comments
1

A: Close Gaps in Cookbook

[RC1 Ch9 - Snezka F2F] RC Cookbook Enhancements #945 

[RI1 Ch07] User Manual initial content #408

User-Execution

  • Common Failure codes, description, and resolutions
  • Test Framework Clean-Up Utility, Process, and Support Expectations

Process / Version Mgmt

  • Process for version control
  • Process for bug fixes and patches
  • Containers Tagged
  • Playbooks grab the tagged version


2C: Conduct Friendly Cookbook Trial
There was a comments that this should be taken by the adoption WS. 

A: Outline Trial Partner Expectations & Establish Contact

3

A:  Descriptor File requirement finalized


chp05  chp06
4
  • C: Need a Topology Diagram.
  • B: Need Networking/Switching Requirements.

chp04

A: 5.2 Add more installer general requirement (e.g. the need for it to be opensource, the result of it needs to be opensource).
chp06

A: Need some initial content (are there no gaps? )


chp09

Development


B: Resolve Continuous Software Deployment Errors


B: Document & Perform Repeatable CICD Deployment



B: Descriptor File - finalize & perform PoC

Refer to: 

  • [RI 1 Core]: Work with OPNFV Infra WG for the evolvment of PDF to fit into need for CNTT RI #526
  • [RI 1 Labs] Tooling to Generate a PDF matching Airship Internal Data Structure #525



Reference Conformance 1


#Deliverable

Target Date

( // )

Comments













Reference Architecture 2


#Deliverable

Target Date

( // )

Comments
1

Propose solutions to existing gaps (traced back through RA2/RM requirements, linked to specific CNCF or other projects)



2

More details about component architecture (ch04) - dickering level



3

More details about Interfaces and APIs - dickering level



4

More details about security (deep dive in LA) - dickering level



5More details about LCM (deep dive in LA) - dickering level 





Reference Implementation 2


#Deliverable

Target Date

( // )

Comments
1


2


3


4


Development













Picks for Hallasan




  • No labels