Meeting Logistics: 

Attendee List:

  1. Qiao Fu (china Mobile)
  2. Michael Fix (AT&T)
  3. Daniel Balsiger (Swisscom)
  4. Lincoln Lavoie
  5. Saad Ullah Sheikh (STC)
  6. Jim Baker (LF)
  7. Georg Kunz (Ericsson)
  8. Jiaqiang Zhang (China Mobile)
  9. Liang Chen (China Mobile)
  10. Scott Steinbrueck (AT&T)
  11. Luc Provoost (Intel)

Goals of Meeting

  1. Status
    1. Labs & Next Steps (POD10/15)
    2. HDV
    3. Manifest Validation
    4. Spirent NFVI/VIM onboard of TCs
    5. RC Test Case | Req Gap Assessment - need to corroborate & close gaps
  2. Review April Release Deliverables
    1. On/by 2/21:
      1. Ensure all Baldy To-Dos are captured (GitHub)
      2. ONES LA Topics Proposals - Technical → session planning 
        1. Confirm list | Add Description | Presenters | Material
    2. Review Backlog
    3. Confirm Volunteer(s)
    4. Confirm Issue
  3. Review open PRs
  4. AOB
    1. Review / Add Apr. CNTT workshop topics
    2. RI/RC 2/19 Gov Slide Review

Agenda:

  1. Status
    1. Labs & Next Steps (POD10/15)
      1. Prior status:  
        1. Pod10: Access to APIs work.  Horizon dashboard not accessible.  Sridhar to redeploy & analyze source of failures.
        2. Pod15: Deployment failures.  Need daily CNTT jobs to stop.  Then, will perform manual deployment.  Email sent to Cedric to stop jobs, and James asking for concurrence of manual investigation plan for failures.
      2. Today status:  
        1. Two patches from opnfv/airship repo.

          1. https://gerrit.opnfv.org/gerrit/c/airship/+/69694 (apply pyyaml patch from upstream) → not use patching, merging to become permanent (already done)

          2. https://gerrit.opnfv.org/gerrit/c/airship/+/69693 (Glance Rally test fix) → have removed Glance testing while deploying, merged and part of OPNFV Airship

        2. Were daily manual deployment and test runs successful?
        3. Timeline to reinstate automated deployments?
        4. POD10 - stable, not running functest
        5. POD15 - have tried three times for deployment; stable deployment (Pike); 1 failed test case
          1. Health check - tempest smoke, trying to find logs (Sridhar)
          2. JIRA ticket opened: #???
    2. HDV - finalize schema, build prototype
      1. Prior status: 
        1. New HDV RI chapter (index) merged https://github.com/cntt-n/CNTT/pull/1022
        2. New PR has been created by Chen Liang for the HDV contents. https://github.com/cntt-n/CNTT/pull/1050
        3. OPNFV weekly (Monday) call - started using the platform as a means to facilitate HDV discussions 
        4. Confirmed Mark B is not able to assist at this time
        5. Solicited developer volunteers to help build prototype.
          1. Mark Beirerl - recommends reviewing - https://rackhd.github.io/
          2. Ram, Vinayak (NFV BU) <vinayak.ram@hpe.com> -
            1. Discussing plan to see if we can leverage his tool
            2. Utilizes standard interfaces based on Redfish to query the infrastructure and get the information to be validated. 
      2. Today status:
        1. Next OPNFV call - China Mobile to share similar validations.
        2. HPE - demo?  Mgmt approval to use? → Mike, checking with Viyanak to attend 2/24 OPNFV call
        3. Review - https://rackhd.github.io/
          1. Mostly done by Dell.
          2. Abstracting for IPMI, Redfish, etc (what Ironic does)
          3. Consensus not to expend energy - rather, pursue CMCC and HPE tools
    3. Manifest Validation - finalize schema
      1. Prior status:
        1.  Sridhar Rao created initial set of aspects (configuration) to validate as part of manifest (S/W) validation.
        2.  Awaiting review/approval from James Gu
      2. Today status: 

        1. Developer volunteers are needed to help build prototype.
    4. Spirent NFVI/VIM onboard of TCs

      1. Prior status:  Checking with engineering to see if they can decouple NFVI/VIM test cases from core packages.

      2. Today status:
    5. RC Test Case | Req Gap Assessment
      1. Prior status:  
        1. Initial pass complete. 
        2. Reviewed and assessed by Functest PTL.
        3. Next steps:
          1. Orange (Cedric) will add traceability (TCs to requirements) in RC Ch 5; to close gaps
          2. (Done) CNTT (Rabi) will help to restructure the RC document by moving Ch 3 content (TC requirements) to Ch5 (Traceability), and switching the order of Ch 4 Cookbook with Ch 5 TC list and traceability.
          3. (Mike) Reached out to OPNFV TSC and LFN to get traction on onboarding needed OPNFV projects 
            1. Yardstick
            2. VSPerf (Sridhar R.)
            3. Barometer (Emma Foley, 2/19)
              1. ...Barometer TCs are not being run with functest.
              2. ...Determine what TCs we have and whether they are still valid/functional

            4. NFVBench
            5. Storperf (Mark B)
      2. Today status:
        1. Best way to on board projects above? 
        2. Share gap assessment with the team.
  2. Review April Deliverables
    1. Candidate ListCNTT Baldy  
    2. RI Goals:
      1. On/by 2/21, Confirm "To Do" Baldy list is complete - https://github.com/cntt-n/CNTT/projects/7
      2. Add new issues to align with Baldy, if missing.
      3. Confirm Volunteer & Issues

        Reference #FeatureNotesVolunteerRelated Issues
        baldy.ri1.1General CleanupsAll ChaptersQiao Fuhttps://github.com/cntt-n/CNTT/issues/1041
        baldy.ri1.2Complete Overall RequirementsCh02Currently do not see any need for update. Will create issue if certain requirement been pointed out
        baldy.ri1.3Complete Lab Requirements → Need an issue?Ch04
        Currently do not see any need for update. Will create issue if certain requirement been pointed out
        baldy.ri1.4Complete Target State & MetadataCh03

        need careful review to see if we capture all the requirement from RM and RA.  

        https://github.com/cntt-n/CNTT/issues/1042

        baldy.ri1.5Complete Installer Requirements and hardware delivery requirement

        Ch05


        Liang Chen

        https://github.com/cntt-n/CNTT/issues/1021

        https://github.com/cntt-n/CNTT/pull/944

        baldy.ri1.6Complete Lab Cookbook (Ops)Ch06

        baldy.ri1.6Restructure & Complete Integration Cookbook → Need an issue?Ch07

        baldy.ri1.7*Implement Profiles within OPNFV Installers and consume CNTT metadataDEV

        Lincoln Lavoie

        Sridhar Rao

        This work depends on the on-going activity and discussion of information model in OPNFV.  create one issue to follow this work

        https://github.com/cntt-n/CNTT/issues/1043

    3. RC Goals:

      1. On/by 2/21, Confirm "To Do" Baldy list is complete - https://github.com/cntt-n/CNTT/projects/4

      2. Add new issues to align with Baldy, if missing.

      3. Confirm Volunteer & Issues

  3. Review open PRs
    1. [RI Ch05] Installer Requirements - issue 846 #944
    2. [RI Ch09] Pharos Details in Development Chapter #1058
    3. [RI] update chp 03 with hardware profile info #1067
    4. [RA1][RC1] Set Neutron extensions as optional #1107
  4. AOB  
    1. Further suggestions for Apr. CNTT workshop
      1. HDV
      2. Manifest
      3. OPNFV Lifec Cycle / Badging
      4. RC delivery (multiple times, confirming CNTT requirements met
    2. Review Gov Slide:  
      1. CNTT_Weekly_Goverance - Final (FIX input - DRAFT 19Feb2020).pptx