You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Wednesday, November 20, 2019

Attendees:

Please add your name in here:

  1. Mark Shostak* (AT&T)

Special Notes:

  • Each of the three RM sections will get 20 minutes
  • Given the limited time available, we will focus on identifying issues/actions/next steps, but not solving them right now
  • Weekly RM meetings are intended to
    • Identify owners for new Issues
    • Track open Issues
    • Address technical issues that cannot be resolved online (i.e. resolve stalls)

Agenda:


  • RM Core (status) (Mark S.)
    • CNTT alignment required for 2019 UNH procurement (MVP / HIGH PRIORITY)
    • Proposed UNH lab hardware configuration
      • Each server shall meet the following minimum specifications:

      • **CPU**
                - 2x CPU sockets, providing 24 cores each, at 2.2 GHz, SMT equipped x86
        **Memory**
                - 512 GB RAM
        **Storage**
                - 3.2 TB SSD via SATA 6 Gbps
                - Storage should present as at least 3 or more disks to the OS, allowing for usage as CEPH storage nodes, or similar.
        **Network Interfaces** (note 1)
                - 4x 10Gbps Ethernet Ports
                - Out-of-band Management Port

        Note 1: At least 1 network interface must be capable of performing PXE boot and that network must be available to both the Jump / Test Host and each bare-metal server.

    • Hardware discussion continuation
  • RM Ops (status) (Ahmed)
    • Issues
    • OA&M - New MVP Content
      • FM
      • Logging
      • Provisioning/State (CM)
    • LCM - New MVP Content
      • LCM scope / areas covered
      • Generic installer model
      • Scope/function/state
      • Node prototypes and creation by installer



  • Open questions
    • TBD


  • New Business

Actions:

  • General
    • None at this time
  •  Core
    • None at this time
  • Ops
    • None at this time
  • Comp
    • None at this time

Minutes:

  • General
    • Nil
  •  Core
    • Nil
  • Ops
    • Nil
  • Comp
    • Nil


  • No labels