Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Added Challenges and Action Items for ONAP ETSI NFV joint container data modeling workshop

...

Tableenhancer
numberOfFixedRows1







Track Name/Link1-2 Key PointsChallengesAction Items

Cross-Community




EUAG New updates - Summary and Next Steps

AI/ML use cases for 5G RAN and 5GC (Note that NWDAF specified use cases can be satisfied with policy based analytics) that operators need

EUAG needs to lead the discussions across the communities on AI/ML activities. 

Are operators are willing to share data with open source communities to create algorithms or even models? 

How can we leverage limited Lab resources to test AI/ML products and algorithms.

Set up a follow up a Plenary session to do a deep dive on the requirements and how can they be realized in actions.  The follow up will include vendors

Anuket




Anuket: PDF 2.0 Definition

PDF is a "Pod Descriptor FIle" for NFVI - 2.0 is an enhanced version developed over the last year.

Beyond the slides, there was a quick demo of the PDF GUI, developed with the help of Parth Yadav (Intern/Student).

There are two types of information included here: is this the best way to keep a single source of truth for HW info and Design info (HW roles, for example) ?
  • There is a reasonable relationship with the work (SDV and HDV) currently taking place in the CIRV project, so this is a potential home/repo for PDF 2.0 work. There is also the possibility to re-activate Pharos specifically to continue the PDF 2.0 work, and that would need a PTL from among the current committers.
  • Continue project-wide meetings to discuss this topic.

Anuket: Acceleration of NFV resource deployment - network configuration automation

Right now, green field installation of HW network devices (ToR to host, rack, other switches) is fraught with error and takes much time.Need help with this process, automate to reduce time and cover multiple vendors.
  • Look into NETCONF and YANG Model control,
  • and ODIM project

2021-02-04 - Anuket: Release Process Goals and Objectives

Need to reconcile the release cycles between different types of artifacts – requirements, use case, code and compliance. 

The different workstreams have different paces of development.

RI and RC are loosely coupled with RM and RA workstreams.

Determine the release cadence and how to fold in the workstreams.
Pick something and iterate. 




ODL




2021-02-04 - ODL: A Bag of New Platform Tricks


2021-02-04 - OpenDaylight and ONAP commonalities


2021-02-04 - OpenDaylight Documentation Talk


2021-02-04 - OpenDaylight new TSC expectations talk


2021-02-04 - ODL: Phosphorus Platform Lookahead


ONAP




ONAP ETSI NFV joint container data model workshop and latest modeling subcommittee process update
  • Impact of new release process on Modeling
  • Workshop on ONAP container data model
Aligning activities between ONAP and ETSI on the container data modeling and package.Invite ETSI to participate in ONAP container data modeling design (during ONAP Resource IM Calls)
ONAP DCAE updates for Honolulu-R8 and focus beyond
  • Review of Guilin DCAE accomplishments, plans for Honolulu, and beyond
  • overview of DCAE deployment plan and how it changes in Honolulu
  • cross-ONAP integration
More resource/community support required for helm transformation 
  • Closed loop integration through Helm (Liam/Ericsson)
  • EMCO plugin analysis for composite service support in MOD (Damian)
ONAP 5G OOF SON use case - Guilin Demo and Roadmap
  • LIVE DEMO - latest functionalities for the 5G SON use case
  • Discussion about changes foreseen in Honolulu
  • Share the roadmap

  • How are we handle ONAP Alarms (format)?
  • SON Control Loop?
ONAP/O-RAN/OSC Alignment - Updates and Roadmap
  • Practical examples about ONAP/O-RAN integration
  • What's next? AI/ML based on Closed Loops


ONAP Support for Vertical Industry - 2021 Planning
  • Presentation of POC performed during the Guilin Release:  Warehouse management industry can deploy 5G network and Automated Guided Vehicles to achieve fully  automatic management and transportation of goods which will greatly improve efficiency and reduce cost.
  • Requirements for Vertical Industry (Tenant management & Isolation, etc.) developed in Honolulu, levering Multi-Tenancy in ONAP


ONAP usage: Microwave Operations Automation using ONAP/CDS
  • Proof-of-Concept demonstrating the automation of some microwave operations, namely the topology auto-discovery, the path calculation and the layer2 services provisioning, relying on the ONAP Controller Design Studio (CDS) and ONAP Active and Available Inventory (AAI).     


ONAP Policy Demos of Guilin
  • Deep Dive of ONAP CLAMP (Control Loop Automation and Management Platform) - From Architecture to Development - including VIDEOS
  • ONAP Policy APEX-PDP running in stand-alone mode
  • ONAP Policy XACML-PDP application creation - LIVE DEMO


ONAP: Using ONAP components to orchestrate on Azure Kubernetes Service


ONAP: Orchestrating a cloud native 5GC across multiple K8s clusters using ONAP components


ONAP Portal Demos of Guilin
  • Deep Dive of ONAP PORTAL (Control Loop Automation and Management Platform) - From Architecture to Development 


ONAP: Standalone GUI for EMCO


XGVela




ODIM























...