Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Panel
titleTable of Contents


Table of Content Zone

Table of Contents
maxLevel3
exclude1\.1
stylenone




Panel
borderColorDarkSalmon
bgColorDarkSalmon

Overview

The intention of this page is to outline what CNTT "success" looks like by June @ LFN DDF 2020, along with high level tracking items that need to be completed.

Success is defined as:

  1. TBD - documentation created ? test suites defined ? test suites executed ?
  2. TBD
  3. TBD


Panel
borderColorDarkSalmon
bgColorDarkSalmon

To-Do (In General)

This is a comprehensive list of work that can be done. A subset of the list below will go into  Hallasan (and will be saved in the release notes for Hallasan).

A: To be included in Hallasan Release.

B: Nice to include in Hallasan Release.

C: Low Priority for Hallasan Release.

Reference Model


#Deliverable

Target Date

( // )

Comments
0


1




2




3






Reference Architecture 1


#Deliverable

Target Date

( // )

Comments
1




2




3


4






Reference Implementation 1


#Deliverable

Target Date

( // )

Comments
1

A: Close Gaps in Cookbook

[RC1 Ch9 - Snezka F2F] RC Cookbook Enhancements #945 

[RI1 Ch07] User Manual initial content #408

User-Execution

  • Common Failure codes, description, and resolutions
  • Test Framework Clean-Up Utility, Process, and Support Expectations

Process / Version Mgmt

  • Process for version control
  • Process for bug fixes and patches
  • Containers Tagged
  • Playbooks grab the tagged version


2C: Conduct Friendly Cookbook Trial
There was a comments that this should be taken by the adoption WS. 

A: Outline Trial Partner Expectations & Establish Contact

3

A:  Descriptor File requirement finalized


chp05  chp06
4
  • C: Need a Topology Diagram.
  • B: Need Networking/Switching Requirements.

chp04

A: 5.2 Add more installer general requirement (e.g. the need for it to be opensource, the result of it needs to be opensource).
chp06

A: Need some initial content (are there no gaps? )


chp09

Development


B: Resolve Continuous Software Deployment Errors


B: Document & Perform Repeatable CICD Deployment



B: Descriptor File - finalize & perform PoC

Refer to: 

  • [RI 1 Core]: Work with OPNFV Infra WG for the evolvment of PDF to fit into need for CNTT RI #526
  • [RI 1 Labs] Tooling to Generate a PDF matching Airship Internal Data Structure #525



Reference Conformance 1


#Deliverable

Target Date

( // )

Comments













Reference Architecture 2


#Deliverable

Target Date

( // )

Comments
1

Propose solutions to existing gaps (traced back through RA2/RM requirements, linked to specific CNCF or other projects)



2

More details about component architecture (ch04) - dickering level



3

More details about Interfaces and APIs - dickering level



4

More details about security (deep dive in LA) - dickering level



5More details about LCM (deep dive in LA) - dickering level 






Reference Implementation 2


#Deliverable

Target Date

( // )

Comments
1


2


3


4


Development

















Panel
borderColorDarkSalmon
bgColorDarkSalmon

Picks for Hallasan