Date

Attendees

LF Staff: Heather Kirksey Jim Baker
Committee Members: Ryan Hallahan Rabi Abdel Trevor Lovett Trevor Cooper Kanagaraj Manickam  Marc Price  Bill Mulligan  Olivier Smith Yan Yang   (I was not able to capture full attendance as I was sharing material, please feel free to update as needed)
Proxies:
Guests:

Minutes

Announced Results of CVC and CNOVP Election Results

Continued Review of WS02 Findings 

  • Material updated based on F2F observations (material)
  • Discussion Regarding Key Decisions from April F2F (NOTE: items in italics are quotes from the material)
    • "CNTT’s RA-2 will be the location and hub for CNF Requirements"
      • RA-2 can still refer to requirements and specifications outside of RA-2 (ex: CNCF Tug work), but the thought is it would be the hub
      • Desire for CNF requirements to be hosted in a LFN project (if even indirectly)
      • Some concerns raised that CNTT focus has been solely on infrastructure vs. true CNF requirements (ex: Cloud Nativeness)
      • This means RA-2 can not point back to the Ref Model for CNF requirements.
      • Action Item: Trevor Lovett & Rabi Abdel Need to confirm the scope and types of requirements that RA-2 will include and if lack of traceability to RM is a concern to be solved
    • "NFVi Performance Testing will move out of the badging program, and move to a benchmarking initiative"
      • Conformance with performance requirements may be needed in the future
      • Creating the requirements at this time may not be achievable
      • Focus would be on establishing a benchmarking initiative to standardize how benchmarking of the NFVI would be performed (example: what would be measured, what tools used, approved labs, etc.)
      • OVP can play a valuable role in specifying how this benchmarking program would work even if we don't start with badging
      • Benchmarking may evolve to explicit conformance requirements in the future
      • Need a team focused on defining how this would work, tools to be used, and what is needed from the various project
      • Proposal is to create a workstream to focus on this, but need volunteers
    • "Performance testing of CNFs should be out of scope for OVP"
      • Felt this may not be out of long term scope of OVP, but is out of scope for MVP.
      • Statement will be revised to be specific to the MVP.
    • Only made it through 3 bullets.

Action items

  • Trevor Lovett  & Rabi Abdel confirm the scope and types of requirements that RA-2 will include and if lack of traceability to RM is a concern to be solved
  • All - Volunteer for Performance Benchmarking workstream