TSC Meeting Zoom || Meeting Recordings
Attendees & Representation
TSC Members and Project representatives should mark their attendance below. Community members tag themselves in the section below the voting members.
X = Present | P = Proxy (Indicate below table with @name for @name
TSC Members |
| x | |
|
|
| | x |
Anders Fagerlind |
| |
|
| x | | x |
|
| Zeyuan Huang |
|
| x | |
|
|
|
|
|
LF Staff: Casey Cain
Community: @Aviv Guetta Rama SubbaReddy Michael Recchia
Agenda
- Update about mavenir participation — Qihui Zhao
- Following Plans for our research and release direction
- Postpone release 1
- Find a release manager and build standard release process
- Directions:
- #1 Management related telco PaaS functionalities: CMaaS(verified but need to update the code) + TMaaS (verified) + Metrics (integration) + Fault analysis (optional)
- #2 OKD + CRD + Telemetry
- Use Case Discussion — Michael Recchia — postponed due to health issue
- Topics for January DTF
Minutes
- Mavenir's participation may change due to budget and collaboration plans with public cloud
- Postpone release 1 to 2022 – Passed
- Feature expension: Existing FMaaS/CMaaS/TMaaS only contains partial functionalities for NF management, which lacks alarm, log, performance, heartbeat (optional), signaling (optional).
- Code API not clear: Interfaces for CIM module to interact with NF are not clearly defined. CMaaS northbound API changed from MANO specific interface using netconf protocol to Restful API.
- Instruction: developer guide, required general paas integration instruction need to be completed & updated.
- Release manager:
- From Casey:
- The project is not budgeted for that. We are working on something to help with a release guidance. However, the community should aim to lead the way in the long term.
- Focus on milestones
- CMCC has talked to Arpit to check if we can get support from the community.
- Future directions & Features:
- Qihui Zhao will prepare a presentation about CMCC plan to cover progress about Direction #1.
- Direction #1 will stick to and continue on the work of year 2021.
- Seshu Kumar Mudiganti will analysis actions need to be coverd on Direction #2 together with Azhar.
- Define CRD for existing telco paas functionalities and support to be managed by operators, which could be extention for Direction #1. Extra work on data model will be included. in this direction
- Then a vote will be made
- Seshu Kumar Mudiganti Qihui Zhaoprepare topics for DTF and send to Casey through Slack
- Invite Brandon to join tsc meeting to give intructions about how to better marketing XGVela
Action Items