Attendees:
Please add your name in here:
- Kelvin Edmison (Nokia)
- Mark Shostak
- Pankaj Goyal (AT&T)
- Gergely Csatari (Nokia)
- Karine Sevilla (Orange)
- shasha guo (China Mobile)
- Tomas Fredberg (Ericsson)
- Rabi Abdel (Vodafone)
- Walter Kozlowski (Telstra)
- Ahmed El Sawaf (STC)
- Tom Van Pelt (GSMA)
- Al Morton (AT&T)
- Trevor Cooper
- Petar Torre (Intel)
- Ulrich Kleber (Huawei)
- Toshiyasu Wakayama (KDDI)
Special Notes:
- Given the limited time available, we will focus on identifying issues/actions/next steps, but not solving them right now
- Weekly RM meetings are intended to
- Identify owners for new Issues
- Track open Issues
- Address technical issues that cannot be resolved online (i.e. resolve stalls)
Agenda:
- New Business
- Can the RM meeting move 1 hr earlier?
- This had been explored previously, but conditions have changed (i.e. preceding RC meeting using same zoom bridge)
Actions:
- General
- Walter Kozlowskito create Etherpad for Networking Fabric discussions for post-Baldy release
- Walter Kozlowski call the first meeting for the Networking Fabric topic
Minutes:
- Discussed RM Appendix A: Guidelines for VNF vendors
- Agreed that:
- guidelines in the RM Appendix A (Guidelines for VNF Vendors) can refer to other standards that specify requirements.
- Requirements are included in the Security Chapter if they are verifiable from from a black-box test of the VNF
- If it is not verifiable in this manner, it can be included as a guideline in the RM Appendix A.
- Networking Fabric
- Use issue #1037 to discuss post-Baldy network fabric plans
- Use issue #587 issue to discuss/track the work needed for Baldy