Item | Assigned to | Due by Date | Status | |
---|---|---|---|---|
1 | Create PR for TOC and Structure for 9.5 in RM Ch09 | Pankaj Goyal | 2020-12-14 1400UTC | |
2 | Approvals of #1 | 2020-12-14 1500 UTC | ||
3 | Mege/Squash #1 | Walter Kozlowski | 2020-12-14 1500 UTC | |
4 | 9.5.2.1 PR | Walter Kozlowski | 2020-12-15 | |
5 | 9.5.2.2 PR | Pankaj Goyal | 2020-12-15 | |
6 | 9.5.1.1 and 9.5.1.2 Requirements | Tomas Fredberg | 2020-12-17 | |
7 | 9.5.1.3 Content + Requirements | Saad Ullah Sheikh | 2020-12-18 | |
8 | Add Cross-Testing Content | Cedric Ollivier |
Table of Contents |
---|
README
- This TOC page has been created with Ahmed El Sawaf Karine Sevilla Petar Torre Saad Sheikh Tomas Fredberg Walter Kozlowski and Pankaj Goyal as editors/owners
Action Items
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
...
9.5.1.1. hardware configuration CI/CD
- Example, BIOS settings, Reset, Power Modes,
- HW component discovery and status/healt supervision
- Composability of physical hardware resources (components)
- Hardware Accelerator discovery, loading and assignment
- Firmware Update and supervision (measurement) of Signed FW on known Authentic HW
- Security related certificates, keys and rolesHardware Accelerators
9.5.1.2. networking automation
- Physical network cabling detection and supervision
- L2, L3 and QoS Automation of Server NIC Network Assignment and Switch Fabric Network Assignment based on HW Provisioning in the HW Infrastructure Layer
- Partitioning, provisioning, enforcement of Overlay switching shared resources e.g. VLAN and VxLAN
9.5.1.3. software development CI/CD –
...
Saad to add content
9.5.1.4. software deployment CI/CD (operator environment) – covered in 9.5.2.2 (inserted 2020-12-07)
9.5.1.5. Identify "Closed Loop Automation" as a Gap in Ch10 – Done (PR #2123 -need reviews)
9.5.2 Workload Software onboarding automation (including CI/CD). Owner: Walter Kozlowski
9.5.2.1. workload Software onboarding automation - the scope for RM is to describe support only but leave the details to RA/RI; Walter Kozlowski to open PR
The Cloud Infrastructure workload onboarding process describes activities needed for the integration of tenants' workloads into the Cloud Infrastructure environment. Typically, this business process consists of the following key phases:
...
All phases described above can be automated using technology specific toolsets and procedures. Hence, details of such automation are left for the technology specific Reference Architecture and Reference Implementation specifications.
9.5.2.2. Software CI/CD Requirements Pankaj Goyal to open PR
The requirements including for CI/CD for ensuring software security scans, image integrity checks, OS version checks, etc. prior to deployment, are listed in the Table XX.XX (below). Please note that the tenant processes for application LCM (such as updates) are out of scope. For the purpose of these requirements, CI includes Continuous Delivery, and CD refers to Continuous Deployment.
...