Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Short Description: create pre-software deployment bare-metal configuration validation
  • Detailed Description: Reference Implementation  cookbook preliminary step for basic lab configuration BEFORE SW deployment (eg.IPMI)
  • Submitted by: Michael Fix (AT&T)
  • Challenge Leader(s): name 1, name 2, ...(LOOKING FOR VOLUNTEER(s) TO LEAD THIS)
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): TBD
  • Skills: OS system navigation, BIOS settings, low-level hardware configuration, etc
  • Interested In Attending: If you are interested in this discussion and would like to participate in it, please add your name and email here (one name/email per line please). We'll use this information when building the schedule so that we minimize overbooking people where possible.
  • Time: 45


...

VNF Family Prototype 

...

  • Short Description:  Take OPNFV phase 2 to take the Kubernetes RA2 through RI into certification of a CNF on a Kubernetes platform conforming with RA2
  • Detailed Description: TBD
  • Challenge Leader(s): user-0322eRabi Abdel
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): TBD
  • Skills:  TBD
  • Interested In Attending: If you are interested in this discussion and would like to participate in it, please add your name and email here (one name/email per line please). We'll use this information when building the schedule so that we minimize overbooking people where possible.
  • Vaibhav Chopra
  • OPNFV/CNTT - may be replaced by CNTT RI2/RA2 discussions

...

  • Short Description:  Demonstrate a prototype of automation tools to test if NFVi complies with CNTT requirements starting with data-path performance
  • Detailed Description: Proposed by Trevor Cooper  . This hack challenge will use PoC work in "POD10" as a baseline and aims to engage developers interested in contributing to this category of CNTT work
  • Challenge Leader(s): Trevor Cooper, Luc Provoost, Petar Torre, Sridhar Rao, Al Morton, ...
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): TBD
  • Skills:  TBD
  • Interested In Attending: If you are interested in this discussion and would like to participate in it, please add your name and email here (one name/email per line please). We'll use this information when building the schedule so that we minimize overbooking people where possible.
  • Time: 45
  • OPNFV/CNTT



...

Deploy your complete continuous integration toolchain for IaaS verification and/or CNTT Compliance in a few commands

...

  • Topic LeaderCedric Ollivier
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): TBD
  • Skills:  TBD
  • Interested In Attending:
  • Vaibhav Chopra
  • Priority:
  • Time: 45

...

Functest Jerma, more than ever a collection of state-of-the-art virtual infrastructure test suites

...

  • Topic LeaderCedric Ollivier
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): TBD
  • Skills:  TBD
  • Interested In Attending:
  • Vaibhav Chopra
  • Priority:
  • Time: 45


...

Developing missing standard interfaces

...

  • Short Description:  Explore requirements of  OVP testing automation , discuss the architecture design, gap analysis,  show a demo and open discussion on collabioration

  • Detailed Description:  Discuss how to leverage open source project to accelerate OVP testing and implement  automatic testing, meanwile identify the gaps and discuss how to make up the gaps and work together to build the open verification and certification test platform 
  • Topic LeaderLingli Deng Yan Yang
  • Estimated Audience Size (1-15 / 15-30 / 30-50 / >50): 20-50
  • Interested In Attending: If you are interested in this discussion and would like to participate in it, please add your name and email here (one name/email per line please). We'll use this information when building the schedule so that we minimize overbooking people where possible.
  • Vaibhav Chopra
  • Time: 45 min
  • OPNFV/CNTT joint session

...