Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

CNTT RI 1 Core

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • Eco-system requirements (Labs, tooling, installers, releases and automation requirements)
  • NFVI, RI, and VNF Requirements.


Ch01: Introduction

Ch02: RI Requirements.

Ch03: NFVI + VNF Target State & Spec

Ch04: Lab Requirements

Ch05: Installers Requirements


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
lead

Fu Qiao Qiao Fu

fuqiao@chinamobile.comfuqiao
contributorChen Liangchenliang@chinamobile.com
ContributorMike Fix (AT&T)michael.fix@att.commf4716
ContributorTrevor Cooper (Intel)trevor.cooper@intel.comtrevgc
ContributorLincoln Lavoie (UNH-IOLlylavoie@iol.unh.edulylavoie
ContributorRabi Abdel (Vodafone)abdel.rabi@vodafone.comrabi-abdel










CNTT RI 1 Labs

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • Procure initial target lab
  • Ensure all entry / exit criteria met
  • Assist with lab selection options (LAAS, Community, Self Service)
  • Release Alignment

Ch06: Lab Operations


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
ContributorMike Fix (AT&T)michael.fix@att.commf4716
LeadRajesh Rajamani (Spirent)rajesh.rajamani@spirent.com
ContributorShiby Parayilsparayil@iconectiv.com
ContributorLincoln Lavoie (UNH-IOL)lylavoie@iol.unh.edulylavoie
ContributorRabi Abdel (Vodafone)abdel.rabi@vodafone.comrabi-abdel








...