Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

CNTT RM  Core

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

The following Chapters of the Reference Model:

Ch01: Introduction

Ch02: Requirements Analysis

Ch03: Modelling

Ch04: Infrastructure Abstraction

Ch05: NFVI Feature set

Appendix-A: VNF Guidelines

Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
ContributorNick Chase (Mirantis)nchase@mirantis.comnickchase
ContributorKarine Sevilla (Orange)karine.sevilla@orange.comkarinesevilla
Lead/Co-LeadKelvin Edmison (Nokia)kelvin.edmison@nokia.comkedmison






























































CNTT RM  Ops

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

The following Chapters of the Reference Model:

Ch06: Interfaces & APIs

Ch07: Security

Ch09: Operations and LCM

Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
ContributorKarine Sevilla (Orange)karine.sevilla@orange.comkarinesevilla
























...

CNTT RI 1  Dev (upstream)

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • Covers installers, automation, etc.
  • Integration of installers and components.
  • Gap analysis with required actions for existing eco-system within LFN/OPNFV community projects
  • Assign Engineering resources into community projects to address gaps
  • Lead and manage Engineering resources pool

Ch07: Integration

Ch08: Gap analysis & Development


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
Leadcedric.ollivier@orange.comollivier

















Reference Certification Workstreams

...

CNTT RC NFVI

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • LCM for C&V framework for NFVI
  • Define E2E Framework Requirements, process and automation for NFVI Certification
  • Ensure Platform Stability, Operability, & Performance for target RAs
  • Leverage and Influence Community C&V Strategies.
  • Provide TC Traceability to RA/RM Requirements and make sure the testing bar is high.


Ch01: Introduction

Ch02: NFVI E2E C&V Framework Requirements

Ch03: NFVI Test Case Requirements

Ch04: NFVI TC Traceability to RA Requirements.


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"

Name (Org)

EmailGitHub ID
lead/co-leadFu Qiaofuqiao@chinamobile.comfuqiao
contributorZhang Honglizhanghongli@chinamobile.com
Co-Leadcedric.ollivier@orange.comcollivier






CNTT RC VNF

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • LCM for C&V framework for VNF
  • Define E2E Framework Requirements, process, and automation for VNF Certification.
  • Ensure Platform Stability, Operability, & Performance.
  • Leverage and Influence Community C&V Strategies.
  • Provide TC Traceability to RM Requirements and make sure the testing bar is high.


Ch05: VNF E2E C&V Framework Requirements

Ch06: VNF Test Case Requirements

Ch07: VNF TC Traceability to RM Requirements.


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
















...

CNTT RC  Dev (upstream)

Workstream Lead: TBA

Workstream Co-Lead: TBA


Scope

  • Covers framework tools, NFVI + VNF Testing.
  • E2EFramework Integration (From OpenSrouce projects)
  • Make sure all test cases needed are implemented
  • Partner with existing LFN testing projects to identify/address gaps.
  • Place Engineering Resources into community projects to address gaps.
  • Manage and lead available engineering resources pool.

Ch08:E2E Framework Integration.

Ch09:NFVI Tests Traceability to TC Requirements.

Ch10:VNF Tests Traceability to TC Requirements.

Ch11:Gap analysis & Development


Workstream Signup

Enter "Lead", "Co-Lead", or "Contributor"Name (Org)EmailGitHub ID
Co-LeadCedric Ollivier