Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

CNTT RM  Core

Workstream Lead/Co-Lead: TBA, TBA


Scope

The following Chapters of the Reference Model:

Ch01: Introduction

Ch02: Requirements Analysis

Ch03: Modelling

Ch04: Infrastructure Abstraction

Ch05: NFVI Feature set

Appendix-A: VNF Guidelines

Workstream Contributors

Name (Org)EmailGitHub ID
Beth Cohen (Vz)beth.cohen@verizon.combfcohen
Ahmed ElSawaf (STC)aelsawaf.c@stc.com.saASawwaf
Bernard Tsai (DT)bernard.tsai@telekom.deBernardTsai-DT
Mark Shostak (AT&T)Mark.Shostak@att.commarkshostak
Karine Sevilla (Orange)karine.sevilla@orange.comkarinesevilla
Petar Torre (Intel)petar.torre@intel.com
Trevor Cooper (Intel)trevor.cooper@intel.comtrevgc
Rabi Abdel (VF)

abdel.rabi@vodafone.com

rabi-abdel
Cédric Ollivier (Orange)cedric.ollivier@orange.comcollivier
Xavier Grall (Orange)xavier.grall@orange.comxavier-grall
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01
Samuel Hellec (Orange)samuel.hellec@orange.comsamuelhellec
Herbert Damker (DT)herbert.damker@telekom.dehdamker
Gergely Csatari (Nokia)gergely.csatari@nokia.comCsatariGergely
Tom Kivlin (VF)tom.kivlin@vodafone.comtomkivlin
























































Walter Kozlowski (Telstra)
Walter Kozlowski (Telstra)walter.kozlowski@team.telstra.comwkozlowski
Mehmet Toy (Vz)mehmet.toy@verizon.com

CNTT RM  Ops

Workstream Lead/Co-Lead: TBA, TBA


Scope

The following Chapters of the Reference Model:

Ch06: Interfaces & APIs

Ch07: Security

Ch09: Operations and LCM

Workstream Contributors

Name (Org)EmailGitHub ID
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01
Tom Kivlin (VF)tom.kivlin@vodafone.comtomkivlin

walter.kozlowski@team.telstra.com

wkozlowski
Mike Bustamente (AT&T)

mb100w@att.com

mbustame
Damian Eagle (Telstra)damian.j.eagle@team.telstra.comd-j-eagle
Sukhdev Kapur (Juniper Networks)sukhdev@juniper.netsukhdevkapur























mf4716

CNTT RM  Comp

Workstream Lead/Co-Lead: TBA, TBA


Scope

  • Certification needs/LCM for both VNF and NFVI.
  • Self Certification and badges requirements. (types, hierarchy, etc)

Ch08: Compliance and Verification

Workstream Contributors

Name (Org)EmailGitHub IDMike Fix (AT&T)mf4716@att.com
Kyle Greenwell (Vz) Kyle.Greenwell@VerizonWireless.comkagreenwell
JONATHAN BELTRAN (AT&T)jb788y@att.comjbeltranatl
















OS Reference Architecture Workstreams

...

karinesevilla

CNTT RA 1 (OS) Core

Workstream Lead/Co-Lead: TBA, TBA


Scope

The following Chapters of the Reference Model:

Ch01: Introduction

Ch02: Requirements

Ch03: High Level Architecture

Ch04: Component Level Architecture

Workstream Contributors

Name (Org)EmailGitHub ID
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01
Beth Cohen (Vz)beth.cohen@verizon.combfcohen
Rabi Abdel (VF)

abdel.rabi@vodafone.com

rabi-abdel
Ian Gardner (VF)ian.gardner@vodafone.comiangardner22
Herbert Damker (DT)herbert.damker@telekom.dehdamker
Karine Sevilla (Orange)karine.sevilla@orange.com
Samuel Hellec (Orange)samuel.hellec@orange.comsamuelhellec
Mehmet Toy (Vz)mehmet.toy@verizon.com
Gergely Csatari (Nokia)gergely.csatari@nokia.comCsatariGergely
Ahmed ElSawaf ( STC)aelsawaf.c@stc.com.saASawwaf
































CNTT RA 1 (OS) Ops

Workstream Lead/Co-Lead: TBA, TBA


Scope

The following Chapters of the Reference Model:

Ch05: Interfaces & APIs

Ch06: Security

Ch07: Operations and LCM

Workstream Contributors

Name (Org)EmailGitHub ID
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01
Sukhdev Kapur (Juniper Networks)sukhdev@juniper.netsukhdevkapur














CNTT RA 1 (OS) Dev (upstream)

Workstream Lead/Co-Lead: TBA, TBA


Scope

Gaps analysis of existing technologies, partnership with OpenStack projects and leading development effort to address them. Lead and manage available Engineering resources pool.


Ch08: Gaps & Development

Workstream Contributors

Developers List

Name (Org)EmailGitHub IDName (Org)EmailGitHub IDSukhdev Kapursukhdev@juniper.net
sukhdevkapur
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01

























K8s Reference Architecture Workstreams

...

ASawwaf

CNTT RA 2 (K8s) Core

Workstream Lead/Co-Lead: TBA, TBA


Scope

Main components selection and choices, strategy, roadmap, etc.

Ch01: Introduction

Ch02: Requirements

Ch03: High Level Architecture

Ch04: Component Level Architecture

Workstream Contributors

Name (Org)EmailGitHub ID
Tamas Zsiros (E///)tamas.zsiros@gmail.comTamasZsiros
Tom Kivlin (VF)tom.kivlin@vodafone.comtomkivlin
Rabi Abdel (VF)abdel.rabi@vodafone.comrabi-abdel
Gergely Csatari (Nokia)gergely.csatari@nokia.comCsatariGergely
Pankaj Goyal (AT&T)pgoyal@att.compgoyal01
Ahmed ElSawaf ( STC)aelsawaf.c@stc.com.sa


























CsatariGergely

CNTT RA 2 (K8s) Ops

Workstream Lead/Co-Lead: TBA, TBA


Scope

Standard interfaces and APIs, Security and LCM.

Ch05: Interfaces & APIs

Ch06: Security

Ch07: Operations and LCM

Workstream Contributors

Name (Org)EmailGitHub IDGergely Csatari (Nokia)gergely.csatari@nokia.com














ASawwaf

CNTT RA 2 (K8s) Dev (upstream)

Workstream Lead/Co-Lead: TBA, TBA


Scope

Gaps analysis of existing technologies, partnership with existing communities (such as TUG) and leading development effort to address them. Lead and manage available engineering resources pool.

Ch08: Gaps analysis & Development

Workstream Contributors

Developers List

 

Name (Org)EmailGitHub IDName (Org)EmailGitHub IDRabi Abdel (VF)abdel.rabi@vodafone.comrabi-abdelSukhdev Kapursukhdev@juniper.net
sukhdevkapur
Gergely Csatari (Nokia)gergely.csatari@nokia.comCsatariGergelyPankaj Goyal (AT&T)pgoyal@att.compgoyal01Ahmed ElSawaf ( STC)aelsawaf.c@stc.com.sa































OPNFV Reference Implementation (CNTT-RI) Workstreams

...

CNTT RI 1  Dev (upstream)

Workstream Lead/Co-Lead: TBA, TBA


Scope

  • Covers installers, automation, etc.
  • Integration of installers and components.
  • Gap analysis with required actions for existing eco-system within LFN/OPNFV community projects
  • Assign Engineering resources into community projects to address gaps
  • Lead and manage Engineering resources pool

Ch07: Integration

Ch08: Gap analysis & Development


Workstream Contributors

 

Name (Org)EmailGitHub IDName (Org)EmailGitHub ID






























...

CNTT RC  Dev (upstream)

Workstream Lead/Co-Lead: TBA, TBA


Scope

  • Covers framework tools, NFVI + VNF Testing.
  • E2EFramework Integration (From OpenSrouce projects)
  • Make sure all test cases needed are implemented
  • Partner with existing LFN testing projects to identify/address gaps.
  • Place Engineering Resources into community projects to address gaps.
  • Manage and lead available engineering resources pool.

Ch08:E2E Framework Integration.

Ch09:NFVI Tests Traceability to TC Requirements.

Ch10:VNF Tests Traceability to TC Requirements.

Ch11:Gap analysis & Development


Workstream Contributors

 

Name (Org)EmailGitHub IDName (Org)EmailGitHub ID






























...