...
- Mark Shostak (AT&T)
- Rabi Abdel (Vodafone)
- shasha guo(ChinaMobile)
- Kelvin Edmison (Nokia)
- Tomas Fredberg (Ericsson)
- Karine Sevilla (Orange)
- Mark Beierl (VMware)
- Ulrich Kleber (Huawei)
- Trevor Cooper (Intel)
- Toshiyasu Wakayama (Toshi) (KDDI)
Special Notes:
- Each of the three RM sections will get 20 minutes
- Given the limited time available, we will focus on identifying issues/actions/next steps, but not solving them right now
- Weekly RM meetings are intended to
- Identify owners for new Issues
- Track open Issues
- Address technical issues that cannot be resolved online (i.e. resolve stalls)
...
- RM Core (status) (Mark S.)
- Issues
- UNH lab hardware approval (if needed)
- SR-IOV continuation (if needed)
EPA (if needed)//deferred- Hardware discussion continuation
- Storage configuration (10x 960GB vs. 3.2TB w/ 3x logical)
- DIMM distribution across sockets, memory controllers and buses
- NIC to socket mapping
- Physical interface assignment (E/W/OpenStack/Storage, N/S, PXE, OOB LOM)
- Hardware Objectives, Guidelines and Approach
- Guidelines vs. Requirements
- Objectives and Drivers for CNTT to specify h/w
- To what granularity
- Implications for RM Comp, RC and RI
...
- General
- None at this time
- None at this time
- Core
- None at this time
- MXS: Follow up on rotating media for UNH servers
- MXS: Follow up on constraints precluding NVMe usage
- MXS: Write proposal for SRIOV language in RM (not transition plan)
- Ops
- None at this time
- Comp
- None at this time
Minutes:
- General
- Nil
- Reviewed LNF/GSMA anti-trust policy
- Core
- General discussion about UNH lap approval, Reached the following conclusions:
- Current PoR is 3.2TB of SSD behind a RAiD controller. ex[psed as
- Consensus is 3.2TB is probably too restrictive
- Trevor proposed we investigate supplementing the SATA SSDs with rotating media
- Ultimately concluded:
- CNTT RI to use an OSD, in snotead of hyper-converged
- Initially maintain homogeneous server fram forFR
- Investigate rotating media
- Investigate why NVMe i is not an option.
- Organization would be root volume on SDD on the host
- SRIOV: Aligned on creating transition plan as an appendix to the RM
- Mark S. took action to write a draft of the language for the RM regarding the SRIOV (not the annex or transition plan)
- Ops
- Nil
- Comp
- Nil