Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Original strawperson presented in 2020-10-22 Meeting NotesAnuket Strawman Top level Structure v0.2.pptx
  2. Updated and presented in 2020-10-29 Meeting Minutes - Anuket Strawman Top level Structure v0.5
  3. Updated after meeting discussion  Meld Ops and Org 2020-11-12 Meeting notes - Anuket Strawman Top level Structure v0.6.pptx
  4. Updated after meeting 12/10/2020Anuket Strawman Top level Structure v0.7.pptx (show feedback loop between spec projects and conformance projects, remove backlog management from TSC work intake)

Consensus points:

  • A single TSC
  • Marketing committee separate from the TSC
  • Business coordination with other technical bodies is responsibility of the TSC
  • ?


Image RemovedImage Added


Anuket Deliverables

...