Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Lab specification and setup Lab Specification and Setup
    1. Evaluate lab requirements from RA-2 (if possible ... may need to read between the lines but this will at least help to give feedback to RA-2 or RI-2) 
    2. Compare with current OPNFV lab spec. (aka Pharos spec.) and highlight any gaps / issues.
    3. Develop / document draft of a CNTT RI-2 lab spec that can be used to deploy and test all Cloud Infrastructure capabilities specified in RA-2. This will be an input to RC for requirements of a CNTT "approved lab" as part of LFN OVP 2.0 (conformance program)
      1. What would be a reasonable number of compute nodes + spec and network topology?
      2. What are differences to CNCF test-bed?
  2. Install and configuration of BMRA Kubernetes Bare-Metal Install and Configuration
    1. Document configurations / learning (configuration of hardware / firmware / software)
    2. Cookbook to follow install with configuration steps
    3. Document issues run into since its a different environment (compare to the CNCF test-bed)
  3. Map BMRA features against RA-2 requirements Kubernetes Bare-metal Features
    1. Features of BMRA that map to RA-2 requirements
    2. Features of BMRA that point to requirements missing from RA-2
    3. RA-2 requirements not met by BMRA
  4. Testing RI-2 (Kubernetes bare-metal testing Kubernetes Bare-metal Testing
    1. WIP

...

  • Specify baseline for installer starting to provision (predeploy validation check?)
  • Features (e.g. SR-IOV) and what needs to be provisioned to enable
  • What is done by the installer and what is outside (e.g. BIOS and bootloader config.)
  •  ...

CNCF Test activities related to RA-2 / RI-2

Requirements from CNTT RA2 https://docs.google.com/spreadsheets/d/12EWZVvlumktXoywvmlYPR_DrU34e7Gk_rSED3VyCG4o/edit?pli=1#gid=0

CNF conformance https://github.com/cncf/cnf-conformance

Contributors

...