Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...


*******************************************************************************=========================================================

Additional Notes / Links:



  • RC Work stream
    • RC NFVI: Rajesh, Mike
      • Documentation moving along?  Ch's 1,2,3,4
      • Issues
      • PRs
      • Status | Tasks  Tasks (Work in progress)
        •  Receive Lab Lab (date)
        •  (In progress) Translate  Translate RA requirements to Manifest Needs Needs (See above for Assistance needed)
        •  Tune Manifest to match RA requirements (Target End State Lab - POD15) - status  status of POD 10, then date for POD 15
        •  Testing
          1. Prepare automation harness - connectivity, validation validation (POD10)? – Cedric?
            1. e.g. functest-smoke-cntt was just created. neutron-tempest-plugin-api is already conformed with the current API section.
          2. Create Test Plan
          3. Finalize Test Harness/Framework
          4. Perform Manifest Validations
          5. Results Collection & Normalization
    • RC VNF:  Mike
      • Documentation moving along?  Ch's 5,6,7
      • Issues
      • PRs
      • Status | Tasks  Tasks (Work in progress)
        1. VNF Prototypes
          •  (In Progress) Families Identified
          •  (In Progress) Test Requirements Identified
          •  

            Strategy

            1. Use POD10 for Network Intensive. 

            2. Measure stats related to the NFVi datapath capacity.

            3. Goal will be to demonstrate full automation of the environment (continuous deployment) with test cases with some useful test results (continuous testing).
            4. Status?  Then look at adding compute and storage intensive VNFs and identify test cases that map back to CNTT specified capabilities. (Luc, Sridhar, Al, Trevor - creating more detailed plan?).
        2. Testing
          1. Create Test Plan
          2. Finalize Test Harness/Framework
          3. Results Collection & Normalization
    • RC Dev: Cedric
      • Documentation moving along?  Ch's 8,9,10,11
      • Issues
      • PRs
      • Status | Tasks  Tasks (Work in progress)
        • Jenkins setup
        • VNF prototype
          1.  Development
          2. Connectivity to POD15

*****************************

Table of Contents + Owners:

  • RC: status | issues
    • NFVI
      • Ch01: Introduction: Rajesh, Kanagaraj,

...

...

        • https://github.com/cntt-n/CNTT/pull/658
        • Synopsis
        • Introduction
        • Principles & Guidelines
        • Goals & Objectives
        • Best Practices
        • Verification methodologies
        • Assumptions & Dependencies
        • Results Collation & Presentation
        • Measurements, Monitoring
        • Governance
        • Resources & References
      • Ch02: NFVI E2E C&V Framework Requirements: Cedric,

...

      • Manik (confirmed) - https://github.com/cntt-n/CNTT/pull/701

        • Methodology
        • Certification Strategy & Vehicle
        • Profiles Reference
        • Compliance, Verification, and Certification
        • Entry & Exit Criteria
        • Frameworks: e.g. Functest (StorePerf, SampleVNF, others?)
      • Ch03: NFVI Test Case Requirements: Georg,

...

      • Toshi (question)

...

      • https://github.com/cntt-n/CNTT/pull/702

        • Assumptions: Automatable, Integrated with CICD tool chain
        • Type of requirement: Bare metal, API, etc
        • Table showing Profile Catalog
        • Identify SW Reference
        • Identify HW Reference
        • Options Available / Configured
        • Extensions Available / Configured
      • Ch04: NFVI TC Traceability to RA Requirements: Rajesh, Dan, Ashok,

...

...

        • Functest knowledge
        • Define RM/RA-1 Openstack requirements
        • Map Framework to Requirements
    • VNF
      • VNF Prototype Plan - details, dates (Trevor)
      • Ch05: VNF E2E C&V Framework Requirements:  Kanagaraj, Cedric,

...

      • Shiby (confirmed) -  https://github.com/cntt-n/CNTT/pull/704

        • Methodology
        • Introduction of Golden VNFs &/or Prototype VNFs
        • Certification Strategy & Vehicle
        • Profiles Reference
        • Compliance, Verification, and Certification process
        • Entry & Exit Criteria
        • Frameworks: Functest, SampleVNF, Prototype Family/Class
      • Ch06: VNF Test Case Requirements: Fu Qiao,

...

      • Yan Yang (confirmed), Chuyi Guo, Kanagaraj,

...

      • Shiby (confirmed) - https://github.com/cntt-n/CNTT/pull/705

        • Assumptions: Automatable, Integrated with CICD tool chain
        • Developer Deliverables (artifacts)
        • Type of requirement: Bare metal, API, etc
        • Type of Interactions: Extended Topology, Complex (Akraino), Functional, HA, Fault, Interoperability
        • Table showing Performance Profiles
        • Table of VNF Class/Family & Characteristics of Each
      • Ch07: VNF TC Traceability to RM Requirements: Rajesh, Kanagaraj,

...

...

        • Functest knowledge
        • Define RM/RA-1 Openstack requirements
        • Map Framework to Requirements
    • Dev
      • Deployment Validations (Cedric)
      • Ch08: E2E Framework Integration: Cedric, Kanagaraj,

...

      • Sridhar (question) Yan Yang (confirmed) - https://github.com/cntt-n/CNTT/pull/707
        • Identify Framework Needs, Goals, and Dependencies
        • Define Opensource Integration (OPNFV, OVP, Functest, CVC, others)
        • Provide Automation Toolchain (list, topology, flow)
      • Ch09: NFVI Tests Traceability to TC Requirements: Cedric,

...

...

      • Liping Zhao (question),

...

...