Attendees:

No need to add, this will be done after the meeting.

Name
Pankaj Goyal
Olivier Smith
Trevor Cooper
Peter Woerndle
Selcuk Duman
Tom Kivlin
Riccardo Gasparetto Stori (vf)
Taylor Carpenter
Michael Pedersen
Lucina Stricko

Agenda and Minutes:

  • Antitrust notices
  • Walk-in items
  • Project review
  • AOB
    • Discussion about whether workload specification should be part of RA2 or not
      • Current position is that all test cases (workload and platform) are defined in RC2, and that all RC2 test cases are based on RA2 requirements
      • Reflected in issue/1496 and others
      • Further detail on how far we go in specifying workload requirements in RA2 specification needs to be tested but the bottom line is we need to define them somewhere 
      • For now, continue as we are
    • vF2F - CNTT/TBC - Gathering and Validating CNF Requirements to Drive RA2 Specification
  • Permanent FYI
  • Actions/Next steps
    • Frederick to present a quick NSM intro in one of the future meetings
    • Network specification - Tom Kivlinproposal to replace table 4-5 with a diagram that shows the architecture, with an associated table showing which part of the architecture deals with each requirement.  e.g. I don't think it's relevant that the multiplexer has to provide Network Policies as existing CNI plugins that the multiplexer calls can (and perhaps should) deal with that.   (Do we need a "Unix" principle - "do one thing, well"?)


Meeting Recording

Not this week, sorry.





  • No labels