Wednesday August 28, 2019

Attendees:

Please add your name in here:

Agenda:

  • Informational.  Zoom change 9/11
  • Sections 8.1-8.3.  No open issues/feedback.  
  • Overall Status (CNTT Gov, 9/5)
    • Following status will be provided / read at the CNTT Gov call Thursday
      • Developing content - in progress for Ch 8
      • Follow-up CNTT > OPNFV > CVC alignment discussions planned for  
      • Test Case Gap Assessment (8.7.9) - email 9/4-9/5 socializing test category/case recommendations, soliciting feedback  
        • Add service/service-configuration (Cedric)
        • SPOC is Murtuza Khan (to collect input/feedback)
        • Spirent to provide additional test case feedback to Murtuza (Rajesh)
      • Formal OPNFV Proj Proposal
        • Draft complete 8/22
        • Entered into OPNFV 8/23
        • CNTT Gov review 8/29, Feedback due 9/8
        • OPNFV Community Review  , Feedback due  
        • OPNFV TSC Vote/Approval  
      • (question)Exploring Need for Ref Implementation Lab
        • Potential RI recommendation
          • 8 servers = 4 compute + 3 control + jump host
            • supports parallel host profile/failover testing
            • supports rack failover scenarios
          • Logical separation across 2 racks, if not physical
          • 2nd environment desired for concurrent testing of different RIs/RMs = so, 16 servers altogether, across 4 racks
          • Same geographical location
        • Questions:
          • Is a 2nd env necessary? - recommended, absolute 
          • If so, is there a need to separate two labs for GeoR testing?  recommended, absolute
          • Are 4 computes and 3 control nodes sufficient?  Are there any concerns? (similar to Pharos) - recommended 
  • Open Issues
    • Issue log
    • Issue #217 - Define Verification / Validation
      • https://www.softwaretestingmaterial.com/verification-and-validation/
      • http://softwaretestingfundamentals.com/verification-vs-validation/ 
      • In software testing, verification and validation are the processes to check whether a software system meets the specifications and that it fulfills its intended purpose or not.  Verification and validation is also known as V & V. It may also be referred to as software quality control.
      • Verification: (Static)
        • Verification is verifying the documents
        • Verification is the process, to ensure that whether we are building the product right i.e., to verify the requirements which we have and to verify whether we are developing the product accordingly or not.
        • Activities involved here are Inspections, Reviews, Walk throughs
      • Validation: (Dynamic)
        • Validation is to validate the actual and expected output of the software
        • Validation is the process, whether we are building the right product i.e., to validate the product which we have developed is right or not.
        • Activities involved in this is Testing the software application
      • Certification: https://users.ece.cmu.edu/~koopman/des_s99/verification/ - Verification/Validation/Certification
        • Certifications include adherence to, and demonstrated proficiency with, planning, development, requirements, verifying, validating, and logistics for communications
        • Generally, standards imposed to provide evidence of skill level, and delivery competence
        • Certifications in software testing are difficult and often based on the methodology, development, and demonstrated performance
    • Issue #236 - Add Interoperability Checks as Exit Criteria
    • Issue #161 - Add Test Case Descriptions and Purpose
      • e.g. Openstack Compute Component - validations
  • Discuss | Review Sections 8.4-8.6
    • 8.4: What is missing for life-cycle management?
    • 8.5: Current OVP and CVC process.  Anything missing?
  • Walk-on Items
    • None
  • Next Steps
    • Project Proposal - OPNFV Community & TSC
    • Continued Documentation Revisions & Reviews

Actions:

  • 9/4 Meeting
    • Owner:  All → Requesting all team members to review/comment on 8.6 between 9/3-9/11, for discussion 9/11. 
    • Owner: Mike Fix (AT&T) - Verify Validation/Verification/Certification is consistent with CVC verbiage
    • Owner: Murtuza Khan (AT&T) - Add additional test case descriptions 
    • Owner: Kyle Greenwell (Verizon) - generate a PR to merge w/ Master
  • 8/28 Meeting
    • Done!  Add Labels to GitHub Issuesto help with Search (Owners: All, but primarily Mike, Kyle) (recommendation from Kelvin, Nokia)
    • Done - but, added to 8.7.9!  Add Murtuza Khan assessment of Test Cases/Harness (in relation to Functest) on Wiki page → under consideration (Owner: Murtuza K)
    • Done - but, need contributor support to assess.  Add {Name} XCI --> include to Etherpad installer project gap analysis → done (Owner: Mike Fix; will also inform CNTT internal Ch 8 team on 8/28 about the new Installer effort needing review)
    • Owner: ALL → Requesting all team members to review/comment on next sections 8.4-8.6 (changed to 8.5) by 9/3 for discussion 9/4. 